The four columns, stage by stage, and what each one leaves behind on paper
0 · One operation, one works order
An operation is the column on the matrix: the thing being attempted, as distinct from the premises it is being attempted in. Each of the four runs in a fixed order of stages, and each ends with a document, because an operation that leaves nothing written down cannot be shown to have happened.
1 · Deep clean (DC)
- Clear and survey. Loose items are moved by the holder beforehand; what remains is listed on the sheet rather than moved blind.
- High level dry. Fittings, tops of frames, pipe runs, vents and extract grilles, taken dry so that the dust is lifted and not spread.
- Surfaces. Cupboard carcasses inside and out, sanitary ware and tiling, glass and reveals, each to the dilution on the sheet.
- Floor. Last, and to whatever the substrate allows: scrub and rinse on vinyl and tile, extraction on carpet, damp mop only on laminate.
- Walk round. Both directions, with the lights on, then with the lights off and the daylight only — the two find different things.
Ends with: a completed room list on the sign-off sheet, countersigned on site where there is somebody to countersign it.
2 · Floor care (FC)
- Sweep or vacuum. Grit is abrasive. Taking it off dry is the difference between cleaning a floor and sanding it.
- Apply and dwell. Neutral detergent at the stated dilution, left for the dwell time on the sheet and not longer, because a solution that dries on the floor has to be done again.
- Agitate. Machine where the room allows the machine, by hand at edges, under fixed units and around pit edges and thresholds.
- Pick up and rinse. Wet pick-up, then clean water, then a second pick-up. Signage stays up until the floor is dry to the hand, not to the eye.
- Seal, where specified. Only on a substrate that takes it, only after the floor is dry through, and only when the room can be kept off for the cure time.
Ends with: the dilution sheet filed with the method statement, and the drying time written on the sign-off so the next trade is not booked over it.
3 · Post-works clean (PW)
- Confirm the trades are off. In writing, from whoever is running the works, with a date rather than an assurance.
- Debris and protection. Gross debris out first; floor protection and taped sheeting lifted after, because lifting it early releases what it has been holding.
- Residues. Plaster splash, adhesive, silicone smears, sticker residue and film, each off the surface it is on and by a method that surface will take.
- Fine dust. Cutting dust travels further than anybody expects: sills, tops of closers, light diffusers, trickle vents, the tops of ceiling tiles.
- Glass last. Then the floor, then out through the route that was kept clean for the purpose.
Ends with: a sheet listing what was lifted and what was deliberately left, so that the handover inspection is not an argument.
4 · Void turnaround (VT)
- Keys and services. Receipt signed, water and power checked, meter readings noted where the order asks for them.
- Kitchen and bathroom. First, because they take longest and because the rest of the unit can dry while they are being done.
- Rooms, then hall. Working toward the door, so that the last thing cleaned is the way out.
- Floors throughout. In the same direction, finishing at the threshold, with the drying time recorded.
- Hand back. Keys returned against the receipt, sheet signed, anything found and left in place listed on it.
Ends with: the signed sheet and the key receipt, filed together. Where the property is one the company itself lets, the same sheet goes on the property file instead — the separation is set out under let property.